Completion of the Challenge to a decision

See

. Online Legal Reference

putting to use the work on the basis of a notice of completion of construction (admissibility, terms, conditions, obligations of the investor)

The accession to the usage may be:

  • Notice completion of construction + no objection.
  • Permission to use.

    Accession to use on the basis of the notification, you can:

  1. is not required to obtain permission to use,
  2. after informing the competent authority at least 21 days before the scheduled start. Lack of authority to object within 21 days - you are ready to use.

    The notification investor is required to join:

    1) the original log structure;

    2) statement of a construction manager:

  • of conformity of a building with the building design and conditions of planning permission and regulations,
  • on reaching a satisfactory state and order the construction site, and - if use - road, street, adjacent properties, building or premises;

    3) a statement of the relevant adjacent land use, if the operation constructed facility is dependent on adequate development;

    4) records of tests and inspections;

    5) an inventory of as-built surveying;

    6) confirm, in accordance with separate regulations, receiving terminals made,

    7) copies of the drawings included in the approved construction project, with marked changes, if necessary, the supplementary description - if nieodstępujących change significantly from the approved design or conditions of a building permit, made while performing works to the notice

    8) a statement of no objection from the PIP, the State Fire Service, Environmental Protection Inspection, Sanitary Inspection,

    In addition, the investor is obliged to submit the owner or manager of any documentation: construction, as well as regarding the actual status of the object.

    Use without notice = competent authority shall impose the penalty for illegal use of a building.

    After the proceedings on a notice of completion of the work or the authorization to use, the competent authority shall promptly investor documents: the original log structure, as-built surveying the inventory and records of tests and inspections.