Zob. Internetowy Informator Prawny

Pozwolenie na użytkowanie obiektu budowlanego (wymóg uzyskania, terminy, tryb postępowania, obowiązki inwestora)

Podstawą przystąpienia do użytkowania może być:

  • Notice of completion of construction + no objection.
  • Permission to use.

    The authorization is required if :

  • Such an obligation under the regulations, for example, sport and recreation facilities, buildings, culture, science and education, religious buildings, health buildings, administration buildings auctions, stations, storage yards, parking facilities, water, road and rail bridges,
  • Such an obligation is clear from dec. o:
  • approval and authorization of the construction project to resume works
  • approved the construction project (if the construction was completed),
  • accession into operation before the completion of all construction works.

    Completion of construction and intention to use the investor shall:

  • State Sanitary Inspectorate,
  • National Labour Inspectorate,
  • National Fire Service

    They occupy the position in the spring. compliance wykonania obiektu budowlanego z projektem.

    Niezajęcie stanowiska w terminie 14 dni = brak sprzeciwu lub uwag.

    Wniosek o udzielenie pozwolenia na użytkowanie =
    wezwanie organu do przeprowadzenia obowiązkowej kontroli budowy w celu stwierdzenia prowadzenia jej zgodnie z ustaleniami i warunkami określonymi w pozwoleniu na budowę.

    Termin kontroli =
    przed upływem 21 dni od dnia doręczenia wezwania inwestora, zawiadamiając go o tej kontroli w terminie 7 dni od dnia dołączenia wezwania.

    control includes checking:

  • compliance with the design a building plot or land development;
  • compliance with a building project architectural and construction ;
  • construction products particularly relevant to construction safety and fire safety;
  • where there is overlap in the building permit requirement demolition of existing buildings not intended for further use or temporary building - the implementation of this obligation, if the demolition deadline specified in the permit;
  • ordering the construction site.

    Control may conduct, under the authority of the competent supervisory authority building, only a person employed in that body, and having special powers.

    with checks drawn protocol.

    finding irregularities = penalty + dec. to refuse to issue a permit.

    The request for authorization investor joined:

  1. original log construction;
  2. statement construction manager:
  • of conformity of a building with the building design and conditions of the building permit and regulations,
  • on reaching a satisfactory condition and order the construction site, and - in case of use - roads, streets, neighboring property, building or premises;
  1. statement on appropriate development of adjacent land, if the operation constructed facility is dependent on adequate development;
  2. test protocols and verification;
  3. as-built surveying inventory;
  4. confirmation in accordance with separate regulations, receiving terminals made.
  5. declaration of no objection or comment from the authorities of the State Sanitary Inspection, National Labour Inspectorate, the State Fire Service;

    Use without permission = penalty for illegal use.

    Notice of completion of construction

    If no permission is required to use enough:

0 comments: